FREQUENTLY ASKED QUESTIONS
Installation of VELUM DESIGN stretch ceiling or decorative wall panels is a straightforward procedure.
Wall, ceiling, roof, and electrical wiring system construction have to be completed before installation. Furniture does not need to be removed and post-installation cleaning is not required, as adhesive materials, cement, or paint are not used to install VELUM DESIGN stretch ceilings.
Electrical wiring has to be installed prior to VELUM DESIGN stretch ceiling installation.
Other than that, no preparation is required. It is possible that some pieces of furniture might have to be moved slightly to gain an eady access to ceilings but no pieces of furniture have to be removed completely, since access is only required around the perimeter of the room.
For perfect VELUM DESIGN stretch ceiling flatness horizontal lines are made using self-leveling lasers and then profiles are attached either to the wall or ceiling around the perimeter.
All lamps and smoke detectors are marked and appropriate VELUM DESIGN platforms are installed. Other type of fixtures should be applied before the final installation od the VELUM DESIGN stretch ceiling membrane.
VELUM DESIGN stretch ceiling membrane has to be unpacked carefully. Lacquered VELUM DESIGN stretch ceilings are protected with polyethylene wrapping foam from dust and accidental damage.
Openings for lamp, smoke detector and other object installation are cut out of the VELUM DESIGN stretch ceilings and then reinforcing rings are inserted.